Eskom extends stage 6 load shedding after suffering further breakdowns
Eskom will publish a further update as soon as there are significant changes.
Eskom will publish a further update as soon as there are significant changes.
Unit 1 of Matla Power Station will be shut down tonight to repair a boiler tube leak.
Eskom has announced a possible move to stage 6 load shedding from 5pm this evening.
© saffarazzi.com. All Rights Reserved. Privacy Policy.
Saffarazzi,
The Pavilion, Corner Portswood and, Dock Rd, Victoria & Alfred Waterfront, Cape Town, 8001, South Africa.
Tel: +27 21 140 3522, hello @ saffarazzi.com
© saffarazzi.com. All Rights Reserved. Privacy Policy.
Saffarazzi,
The Pavilion, Corner Portswood and, Dock Rd, Victoria & Alfred Waterfront, Cape Town, 8001, South Africa.
Tel: +27 21 140 3522, hello @ saffarazzi.com