Stellantis, Samsung SDI to Build Second StarPlus Energy Gigafactory in the USA
Joint venture between Stellantis and Samsung SDI to build battery plant with start of production planned in early 2027
Joint venture between Stellantis and Samsung SDI to build battery plant with start of production planned in early 2027
© saffarazzi.com. All Rights Reserved. Privacy Policy.
Saffarazzi,
The Pavilion, Corner Portswood and, Dock Rd, Victoria & Alfred Waterfront, Cape Town, 8001, South Africa.
Tel: +27 21 140 3522, hello @ saffarazzi.com
© saffarazzi.com. All Rights Reserved. Privacy Policy.
Saffarazzi,
The Pavilion, Corner Portswood and, Dock Rd, Victoria & Alfred Waterfront, Cape Town, 8001, South Africa.
Tel: +27 21 140 3522, hello @ saffarazzi.com